Frequently Asked Questions

Find answers to the most common questions about our inspections, appointments, and administration.

The easiest way is to use our online form. You can also call us at 010 45 41 06.
On average, our delays are between 5 and 15 working days.
Check your spam folder first. Ensure payment has been made and proof sent. If the issue persists, contact us.
Yes, free of charge up to 48 working hours before the appointment.
Payment is usually done on site via QR-Code or via bank transfer indicated on the service order. For industrial and consultancy missions, an invoice will be sent after the intervention.
You can consult the full text on the FPS Economy website. We have also created a 'summarized' and illustrated version of the domestic rules, available here (currently in French only).
You must present the unifilar diagrams, the position plans of the installation, and previous reports. The EAN code (on your energy bill) is also required.
You must prepare the unifilar diagrams, position plans, External Influence Factors (EIF), any calculation notes, technical characteristics of the connection (power, connection type), the list of evacuation routes, previous reports, the position plan of earth electrodes, and documents for critical and safety installations.
You receive a report with the noted infractions. For a domestic installation, you then have a deadline (usually 12 months; for a sale, 12 months from the inspection date for an installation built or substantially modified after 1981, 18 months from the deed for an installation dating from before 1981) to make it compliant. If the installation is non-domestic, you have no deadline and the work must be carried out as soon as possible.
A compliant certificate is valid for 25 years for a home (domestic). For businesses (LV), the periodicity is 5 years. The validity is 1 year for High Voltage installations and temporary installations (construction sites, funfairs, events).
It is preferable that the owner or someone familiar with the installation be present to provide access to the premises and answer the inspector's questions.
Infrared thermographic analysis detects abnormal heating in your electrical panels without turning off the power. It is often required by insurers (REGELEC standard) for fire prevention.
For panels, the unifilar diagram must include the inverter and protections. For charging stations, the presence of suitable differential protection (Type B or 6mA DC detection) is verified.
The inspection verifies compliance according to the NBN C18-100 or NBN EN 62305 standards. A risk analysis determines the required protection level.

Periodicity: Mandatory before commissioning/modification, and recommended every 2 years.
Note: Radioactive lightning rods are prohibited and must be disposed of.
Your installer must perform a tightness test (Elgacert). We then verify compliance with standard NBN D51-003.
The isometric diagram of the installation is mandatory.
Yes, in the Walloon Region, CertIBEau is mandatory for any new connection to the public water distribution network (new construction or major modification) since June 1, 2021.
Plans, invoices for insulation/windows, boiler specs, etc.
To comply with the NBN S21-100-1 standard, your dossier must contain: a risk analysis, building plans, the single-line diagram, EN-54 technical sheets, a logbook, and commissioning certificates. Use our free assistant to generate your complete dossier in minutes.
Frequently asked questions about our inspections | BELOR